<p>PROJECT: DURO FELGUERA ARGENTINA S.A. – FAINSER S.A. – UTE – Electrical assembly. Vuelta de Obligado combined cycle power plant&hellip;</p>{"id":381,"date":"2017-02-24T18:05:28","date_gmt":"2017-02-24T18:05:28","guid":{"rendered":"http:\/\/ingener.aride.com.ar\/?p=381\/"},"modified":"2019-05-22T19:05:47","modified_gmt":"2019-05-22T19:05:47","slug":"latest-news-feb-2017","status":"publish","type":"post","link":"https:\/\/www.ingener.com\/en\/latest-news-feb-2017\/","title":{"rendered":"LATEST NEWS &#8211; FEB. 2017"},"content":{"rendered":"<p><strong>PROJECT:<\/strong><\/p>\n<p><strong>DURO FELGUERA ARGENTINA S.A. \u2013 FAINSER S.A. \u2013 UTE \u2013 Electrical assembly. Vuelta de Obligado combined cycle power plant (800\u00a0MW).<\/strong><\/p>\n<p>&nbsp;<\/p>\n<p><strong>PROJECT:<\/strong><\/p>\n<p><span style=\"font-weight: 400;\">DF (DuroFelguera) is an international company specializing in the execution of turnkey projects for the energy, manufacturing and oil &amp; gas sectors, as well as providing specialized services for the manufacturing industry and producing capital goods. Since 2015, the Company has been responsible for the EPC (Engineering, Procurement and Construction) of the 800 MW Vuelta de Obligado combined cycle thermal power plant, which is currently in its final stage of construction. At the beginning of 2017, DF awarded a contract to Ingener to carry out power and control wiring works in three specific areas: biodiesel tanks, natural gas compressors and the truck loading bay.<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><strong><b>BEGINNING<\/b>:\u00a0<\/strong><\/p>\n<p>January 2017<\/p>\n<p>&nbsp;<\/p>\n<p><strong>DEADLINE:<\/strong><\/p>\n<p><strong>\u00a0<\/strong>April 2017<\/p>\n","protected":false},"excerpt":{"rendered":null,"protected":false},"author":1,"featured_media":348,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[60],"tags":[],"class_list":["post-381","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-prensa"],"_links":{"self":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts\/381","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/comments?post=381"}],"version-history":[{"count":3,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts\/381\/revisions"}],"predecessor-version":[{"id":1126,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts\/381\/revisions\/1126"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/media\/348"}],"wp:attachment":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/media?parent=381"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/categories?post=381"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/tags?post=381"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}