<p>Client: APR Energy Argentina – End Client: Compañía Administradora del Mercado Mayorista Eléctrico S.A. (Argentina). &nbsp; Project: Given the power&hellip;</p>{"id":393,"date":"2016-09-30T15:53:49","date_gmt":"2016-09-30T15:53:49","guid":{"rendered":"http:\/\/ingener.aride.com.ar\/?p=393\/"},"modified":"2019-05-22T19:09:28","modified_gmt":"2019-05-22T19:09:28","slug":"latest-news-sept-2016-client-apr-energy-argentina-end-client-compania-administradora-del-mercado-mayorista-electrico-s-a-argentina","status":"publish","type":"post","link":"https:\/\/www.ingener.com\/en\/latest-news-sept-2016-client-apr-energy-argentina-end-client-compania-administradora-del-mercado-mayorista-electrico-s-a-argentina\/","title":{"rendered":"LATEST NEWS-SEPT. 2016"},"content":{"rendered":"<p><b>Client<\/b><span style=\"font-weight: 400;\">: APR Energy Argentina \u2013 <\/span><b>End Client<\/b><span style=\"font-weight: 400;\">: Compa\u00f1\u00eda Administradora del Mercado Mayorista El\u00e9ctrico S.A. (Argentina).<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><b>Project:<\/b><\/p>\n<p><span style=\"font-weight: 400;\">Given the power state of emergency declared in Argentina, the Compa\u00f1\u00eda Administradora del Mercado Mayorista El\u00e9ctrico S.A. [the administrator of the wholesale electricity market]<\/span> <span style=\"font-weight: 400;\">has called for bids for 1 GW thermal generation supply. In this tender, APR Energy won a bulk demand contract for the installation, commissioning <\/span><span style=\"font-weight: 400;\">\u2014<\/span><span style=\"font-weight: 400;\">under a very tight deadline (3 months)<\/span><span style=\"font-weight: 400;\">\u2014<\/span><span style=\"font-weight: 400;\"> and 5-year operation of a 215 MW power plant, which would be connected the existing 132 kV Matheu substation in Pilar, Buenos Aires, Argentina.<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><b>Our work:<\/b><\/p>\n<p><span style=\"font-weight: 400;\">Being its first project in Argentina, Ingener is the contractor for the electro-mechanical assembly of the plant. It consists of ten 25 MW dual-fuel (diesel and gas) aeroderivative turbines and all the necessary services for their operation: cooling water, fuel supply, power and control installation, as well as the 132 kV interconnection to the existing Edenor substation. The completion date is a key factor in this project; the plant is expected to set to go on stream<\/span> <span style=\"font-weight: 400;\">before the summer of 2016\/17 to cover the increased demand for electricity resulting from the use of air conditioning equipment in high temperatures.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u00a0<\/span><\/p>\n<p><b>Beginning: <\/b><span style=\"font-weight: 400;\">Sept.\/2016.<\/span><\/p>\n<p><b>Deadline: <\/b><span style=\"font-weight: 400;\">3 months<\/span><\/p>\n","protected":false},"excerpt":{"rendered":null,"protected":false},"author":1,"featured_media":281,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[60],"tags":[],"class_list":["post-393","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-prensa"],"_links":{"self":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts\/393","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/comments?post=393"}],"version-history":[{"count":3,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts\/393\/revisions"}],"predecessor-version":[{"id":1154,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts\/393\/revisions\/1154"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/media\/281"}],"wp:attachment":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/media?parent=393"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/categories?post=393"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/tags?post=393"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}