{"id":989635,"date":"2024-01-16T20:12:39","date_gmt":"2024-01-16T20:12:39","guid":{"rendered":"https:\/\/www.ingener.com\/et-cardal-500-kv\/"},"modified":"2026-11-03T13:44:04","modified_gmt":"2026-11-03T12:44:04","slug":"cardal-substation-500-kv","status":"publish","type":"post","link":"https:\/\/www.ingener.com\/en\/cardal-substation-500-kv\/","title":{"rendered":"Cardal Substation &#8211; 500 kV"},"content":{"rendered":"<div class=\"vgblk-rw-wrapper limit-wrapper\">\n<div class=\"proyecto-detalles\" style=\"margin-bottom:25px;\">\n<p class=\"proyecto-lugar-periodo\" style=\"color:#1FA22E;font-size:1.4em;font-weight:700;text-transform:uppercase;letter-spacing:0.5px;margin:0 0 6px 0;\">Cardal, Uruguay \u2014 2021\/2024<\/p>\n<\/div>\n<p>Construction of a new 500 kV transmission substation in a breaker-and-a-half configuration (seven circuit breakers), including the supply and installation of 15 single-phase 500 kV reactors.<\/p>\n<p>The scope of work included detailed engineering, procurement, construction of Cardal Substation, the loop-in of the PA5 (Palmar)\u2013MA5 (Montevideo) line and its connection to the new substation, as well as protection and communications work at the remote-end substations.<\/p>\n<div class=\"proyecto-galeria\">\n<figure><img decoding=\"async\" src=\"https:\/\/www.ingener.com\/wp-content\/uploads\/2024\/06\/ET-Cardal-1-scaled.jpg\" alt=\"ET Cardal - 500 kV\" loading=\"lazy\" \/><\/figure>\n<figure><img decoding=\"async\" src=\"https:\/\/www.ingener.com\/wp-content\/uploads\/2024\/06\/ET-Cardal-3-scaled.jpg\" alt=\"ET Cardal - 500 kV\" loading=\"lazy\" \/><\/figure>\n<figure><img decoding=\"async\" src=\"https:\/\/www.ingener.com\/wp-content\/uploads\/2024\/06\/ET-Cardal-2-scaled.jpg\" alt=\"ET Cardal - 500 kV\" loading=\"lazy\" \/><\/figure>\n<\/div>\n<\/div>\n<p><!-- .vgblk-rw-wrapper --><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Cardal, Uruguay \u00b7 2021\/2024<\/p>\n","protected":false},"author":1,"featured_media":989636,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[101,110,100,93,92],"tags":[118],"class_list":["post-989635","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-civil-works","category-epc","category-high-and-extra-high-voltage","category-power","category-projects","tag-uruguay"],"_links":{"self":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts\/989635","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/comments?post=989635"}],"version-history":[{"count":1,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts\/989635\/revisions"}],"predecessor-version":[{"id":989742,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts\/989635\/revisions\/989742"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/media\/989636"}],"wp:attachment":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/media?parent=989635"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/categories?post=989635"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/tags?post=989635"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}