{"id":989641,"date":"2022-02-28T11:55:33","date_gmt":"2022-02-28T11:55:33","guid":{"rendered":"https:\/\/www.ingener.com\/upm-paso-de-los-toros\/"},"modified":"2026-11-03T13:44:13","modified_gmt":"2026-11-03T12:44:13","slug":"upm-paso-de-los-toros","status":"publish","type":"post","link":"https:\/\/www.ingener.com\/en\/upm-paso-de-los-toros\/","title":{"rendered":"UPM Paso de los Toros"},"content":{"rendered":"<div class=\"vgblk-rw-wrapper limit-wrapper\">\n<div class=\"proyecto-detalles\" style=\"margin-bottom:25px;\">\n<p class=\"proyecto-lugar-periodo\" style=\"color:#1FA22E;font-size:1.4em;font-weight:700;text-transform:uppercase;letter-spacing:0.5px;margin:0 0 6px 0;\">Paso de los Toros, Uruguay \u2014 2019\/2022<\/p>\n<\/div>\n<p>In July 2019, UPM decided to build its second pulp mill in Uruguay, in Paso de los Toros\/Pueblo Centenario, in the department of Durazno. It is one of the largest pulp mills in the world, with a production capacity of 2 million tonnes per year.<\/p>\n<p>Over the course of the project, UPM has entrusted Ingener with the following works:<br \/>\n&#8211; Engineering, construction and commissioning of the <strong>150 kV connection and metering point (PCyM)<\/strong> that will connect the mill to the national power grid. The works also include the expansion of the Bonete B 150 kV substation.<br \/>\n&#8211; Design, execution and commissioning of the temporary power network, including its subsequent management, operation and maintenance. This scope included the supply and installation of <strong>12 substations of 33\/0.4 kV, 1.0 MVA<\/strong> each, a 33 kV internal power network, low-voltage distribution, distribution boards and backup generator sets.<br \/>\n&#8211; Process electrification and instrumentation works, including the supply, laying and termination of more than <strong>350 km of MV and LV cables<\/strong> and the installation of <strong>more than 8,000 instrumentation hook-ups<\/strong>.<br \/>\n&#8211; Power electrification works, including the installation of a <strong>7-bay 150 kV GIS substation<\/strong> within the mill, the laying and termination of <strong>7.5 km of 150 kV cable<\/strong>, the installation of <strong>4 transformers of 150\/33 kV<\/strong>, the installation of <strong>90 MV switchgear cubicles (33 kV)<\/strong>, the installation of <strong>more than 1,500 motor control and protection panels (MCCs)<\/strong>, among others.<br \/>\n&#8211; Process piping works, including the supply and installation of more than <strong>500 tonnes of piping<\/strong> (mainly stainless steel) and the execution of <strong>more than 100,000 weld inches<\/strong>, all under quality certification to European standards.<br \/>\n&#8211; Complete HVAC and industrial ventilation system for the mill, including the installation of more than <strong>400 tonnes of metal ductwork<\/strong>, the installation of <strong>25 chillers for chilled-water generation and 140 air handling units<\/strong>.<br \/>\n&#8211; Installation of the <strong>mill\u2019s two steam turbines<\/strong>, each rated at 200 MW<br \/>\n&#8211; Perimeter lighting for the mill, including more than <strong>14 km of road lighting<\/strong> with 160 W LED luminaires, for a total lighting installation of approximately 60 kW, including a remote control system for monitoring and managing the lighting system.<br \/>\n&#8211; Outdoor lighting system for the entire mill, including road lighting and lighting of the wood yard using <strong>30-meter-high monopoles<\/strong> with 550 W LED floodlights, among others. This lighting system totals almost <strong>200 kW of installed capacity<\/strong>, including a remote control system for monitoring and managing the lighting system.<\/p>\n<div class=\"proyecto-galeria\">\n<figure><img decoding=\"async\" src=\"https:\/\/www.ingener.com\/wp-content\/uploads\/2022\/02\/DSC00577-scaled.jpg\" alt=\"UPM Paso de los Toros\" loading=\"lazy\" \/><\/figure>\n<figure><img decoding=\"async\" src=\"https:\/\/www.ingener.com\/wp-content\/uploads\/2022\/02\/IMG_6620-scaled.jpg\" alt=\"UPM Paso de los Toros\" loading=\"lazy\" \/><\/figure>\n<figure><img decoding=\"async\" src=\"https:\/\/www.ingener.com\/wp-content\/uploads\/2022\/02\/DSC00544-scaled.jpg\" alt=\"UPM Paso de los Toros\" loading=\"lazy\" \/><\/figure>\n<figure><img decoding=\"async\" src=\"https:\/\/www.ingener.com\/wp-content\/uploads\/2022\/02\/DSC09788-scaled.jpg\" alt=\"UPM Paso de los Toros\" loading=\"lazy\" \/><\/figure>\n<figure><img decoding=\"async\" src=\"https:\/\/www.ingener.com\/wp-content\/uploads\/2022\/02\/DSC09721-scaled.jpg\" alt=\"UPM Paso de los Toros\" loading=\"lazy\" \/><\/figure>\n<\/div>\n<\/div>\n<p><!-- .vgblk-rw-wrapper --><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Paso de los Toros, Uruguay \u00b7 2019\/2022<\/p>\n","protected":false},"author":1,"featured_media":989642,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[109,107,96,113,93,92],"tags":[118],"class_list":["post-989641","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-electrical-instrumentation-automation","category-hvac","category-industry","category-mechanical","category-power","category-projects","tag-uruguay"],"_links":{"self":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts\/989641","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/comments?post=989641"}],"version-history":[{"count":1,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts\/989641\/revisions"}],"predecessor-version":[{"id":989752,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts\/989641\/revisions\/989752"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/media\/989642"}],"wp:attachment":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/media?parent=989641"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/categories?post=989641"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/tags?post=989641"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}