{"id":989643,"date":"2021-12-17T14:14:01","date_gmt":"2021-12-17T14:14:01","guid":{"rendered":"https:\/\/www.ingener.com\/subestacion-valenzuela-500-kv\/"},"modified":"2026-11-03T13:46:50","modified_gmt":"2026-11-03T12:46:50","slug":"valenzuela-substation-500-kv","status":"publish","type":"post","link":"https:\/\/www.ingener.com\/en\/valenzuela-substation-500-kv\/","title":{"rendered":"VALENZUELA SUBSTATION \u2013 500 kV"},"content":{"rendered":"<div class=\"vgblk-rw-wrapper limit-wrapper\">\n<div class=\"proyecto-detalles\" style=\"margin-bottom:25px;\">\n<p class=\"proyecto-lugar-periodo\" style=\"color:#1FA22E;font-size:1.4em;font-weight:700;text-transform:uppercase;letter-spacing:0.5px;margin:0 0 6px 0;\">Valenzuela, Paraguay \u2014 2021\/2024<\/p>\n<\/div>\n<p>Construction of the 500 kV Valenzuela substation began in 2021. It will become Paraguay\u2019s most important infrastructure, enabling the country, for the first time, to make use of 100% of the energy generated by the binational Itaip\u00fa hydroelectric plant.<\/p>\n<p>&nbsp;<\/p>\n<p>The project, which also includes the interconnection to the national power system, was awarded to Consorcio San Jos\u00e9, made up of Ingener together with Saceem (Uruguay) and Concret Mix (Paraguay).<\/p>\n<p>&nbsp;<\/p>\n<p>Specifically, the project involves the construction of a new transformer substation in Valenzuela, in the department of Cordillera, and the sectioning of 500 kV and 220 kV transmission lines, along with other complementary works.<\/p><\/div>\n<p><!-- .vgblk-rw-wrapper --><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Valenzuela, Paraguay \u00b7 2021\/2024<\/p>\n","protected":false},"author":1,"featured_media":989644,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[102,100,93,92],"tags":[117],"class_list":["post-989643","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-electrical-infrastructure","category-high-and-extra-high-voltage","category-power","category-projects","tag-paraguay"],"_links":{"self":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts\/989643","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/comments?post=989643"}],"version-history":[{"count":1,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts\/989643\/revisions"}],"predecessor-version":[{"id":989769,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts\/989643\/revisions\/989769"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/media\/989644"}],"wp:attachment":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/media?parent=989643"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/categories?post=989643"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/tags?post=989643"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}