{"id":989685,"date":"2020-06-27T21:20:35","date_gmt":"2020-06-27T21:20:35","guid":{"rendered":"https:\/\/www.ingener.com\/montaje-electrico-y-mecanico-planta-de-agua-laminacion-y-desbaste\/"},"modified":"2026-11-03T13:49:39","modified_gmt":"2026-11-03T12:49:39","slug":"gerdau-water-plant-rolling-roughing-mill","status":"publish","type":"post","link":"https:\/\/www.ingener.com\/en\/gerdau-water-plant-rolling-roughing-mill\/","title":{"rendered":"Gerdau &#8211; Water Plant, Rolling and Roughing Mill"},"content":{"rendered":"<div class=\"vgblk-rw-wrapper limit-wrapper\">\n<div class=\"proyecto-detalles\" style=\"margin-bottom:25px;\">\n<p class=\"proyecto-lugar-periodo\" style=\"color:#1FA22E;font-size:1.4em;font-weight:700;text-transform:uppercase;letter-spacing:0.5px;margin:0 0 6px 0;\">Uruguay \u2014 2014<\/p>\n<p class=\"proyecto-cliente\" style=\"color:#777777;margin:0;\">Client: Gerdau Laisa<\/p>\n<\/div>\n<p>Gerdau, a steel producer, hired Ingener in 2014 to carry out the mechanical installation of equipment at the water plant and the roughing and rolling mill (approximately 250 tonnes), as well as the related electrical installations.<\/p>\n<p>&nbsp;<\/p>\n<p>The works consisted of:<\/p>\n<p>-Installation of steel structures, walkways, stairs, handrails, pipe supports, fittings and accessories.<\/p>\n<p>-Hydrostatic testing, visual inspections and gamma radiography testing.<\/p>\n<p>-Operational cleaning of piping (compressed air, hydraulics, lubrication and greasing).<\/p>\n<p>-Supply of panels.<\/p>\n<p>-Fabrication and installation of piping for the hydraulic lubrication and greasing system of the plant\u2019s rolling mills.<\/p>\n<p>-Fabrication and installation of piping for the water treatment plant.<\/p>\n<div class=\"proyecto-galeria\">\n<figure><img decoding=\"async\" src=\"https:\/\/www.ingener.com\/wp-content\/uploads\/2020\/06\/15_Industria_AAK.png\" alt=\"Gerdau - Planta de Agua, Laminaci\u00f3n y Desbaste\" loading=\"lazy\" \/><\/figure>\n<\/div>\n<\/div>\n<p><!-- .vgblk-rw-wrapper --><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Uruguay \u00b7 2014<\/p>\n","protected":false},"author":1,"featured_media":989686,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[96,113,92],"tags":[118],"class_list":["post-989685","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry","category-mechanical","category-projects","tag-uruguay"],"_links":{"self":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts\/989685","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/comments?post=989685"}],"version-history":[{"count":1,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts\/989685\/revisions"}],"predecessor-version":[{"id":989795,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts\/989685\/revisions\/989795"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/media\/989686"}],"wp:attachment":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/media?parent=989685"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/categories?post=989685"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/tags?post=989685"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}