{"id":989703,"date":"2020-06-26T17:36:35","date_gmt":"2020-06-26T17:36:35","guid":{"rendered":"https:\/\/www.ingener.com\/ampliacion-data-center-pando-fases-ii-y-iii\/"},"modified":"2026-11-03T13:48:16","modified_gmt":"2026-11-03T12:48:16","slug":"antel-data-center-pando-phases-ii-iii","status":"publish","type":"post","link":"https:\/\/www.ingener.com\/en\/antel-data-center-pando-phases-ii-iii\/","title":{"rendered":"Antel Data Center Pando &#8211; Phases II and III"},"content":{"rendered":"<div class=\"vgblk-rw-wrapper limit-wrapper\">\n<div class=\"proyecto-detalles\" style=\"margin-bottom:25px;\">\n<p class=\"proyecto-lugar-periodo\" style=\"color:#1FA22E;font-size:1.4em;font-weight:700;text-transform:uppercase;letter-spacing:0.5px;margin:0 0 6px 0;\">Pando, Uruguay \u2014 2018\/In progress<\/p>\n<p class=\"proyecto-cliente\" style=\"color:#777777;margin:0;\">Client: ANTEL<\/p>\n<\/div>\n<p>In 2018, ANTEL entrusted Ingener with the turnkey construction of Phases II and III of Antel\u2019s Data Center in Pando.<\/p>\n<p>&nbsp;<\/p>\n<p>The works carried out included:<\/p>\n<p>-Engineering development.<\/p>\n<p>-Supply and installation of all civil, electrical and mechanical works required to fit out a complete data hall at the Data Center.<\/p>\n<p>&nbsp;<\/p>\n<p>The Data Center\u2019s data hall, designed in line with the Uptime Institute\u2019s TIER III guidelines, is one of the most modern in Uruguay and the region, with capacity for more than 350 racks.<\/p>\n<p>&nbsp;<\/p>\n<p>For this data hall, Ingener carried out:<\/p>\n<p>-Engineering, supply and construction of the complete medium- and low-voltage electrical installation, including the power generation plant.<\/p>\n<p>-Complete installation of the HVAC system.<\/p>\n<p>-Complete IT infrastructure, including data cabling.<\/p>\n<p>-Fuel system and associated civil works.<\/p>\n<p>&nbsp;<\/p>\n<p>After the execution and commissioning of the installation, Ingener took over full preventive and corrective maintenance of the Data Center for a 3-year term.<\/p>\n<div class=\"proyecto-galeria\">\n<figure><img decoding=\"async\" src=\"https:\/\/www.ingener.com\/wp-content\/uploads\/2020\/06\/DSC08777-scaled.jpg\" alt=\"Antel Data Center Pando - Fases II y III\" loading=\"lazy\" \/><\/figure>\n<figure><img decoding=\"async\" src=\"https:\/\/www.ingener.com\/wp-content\/uploads\/2020\/06\/DSC08804-scaled.jpg\" alt=\"Antel Data Center Pando - Fases II y III\" loading=\"lazy\" \/><\/figure>\n<figure><img decoding=\"async\" src=\"https:\/\/www.ingener.com\/wp-content\/uploads\/2020\/06\/DSC08758-scaled.jpg\" alt=\"Antel Data Center Pando - Fases II y III\" loading=\"lazy\" \/><\/figure>\n<figure><img decoding=\"async\" src=\"https:\/\/www.ingener.com\/wp-content\/uploads\/2020\/06\/DJI_0945-scaled.jpg\" alt=\"Antel Data Center Pando - Fases II y III\" loading=\"lazy\" \/><\/figure>\n<figure><img decoding=\"async\" src=\"https:\/\/www.ingener.com\/wp-content\/uploads\/2020\/06\/02_Industria_Antel-DC.jpg\" alt=\"Antel Data Center Pando - Fases II y III\" loading=\"lazy\" \/><\/figure>\n<\/div>\n<\/div>\n<p><!-- .vgblk-rw-wrapper --><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Pando, Uruguay \u00b7 2018\/In progress<\/p>\n","protected":false},"author":1,"featured_media":989704,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[95,96,92],"tags":[118],"class_list":["post-989703","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-data-center","category-industry","category-projects","tag-uruguay"],"_links":{"self":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts\/989703","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/comments?post=989703"}],"version-history":[{"count":1,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts\/989703\/revisions"}],"predecessor-version":[{"id":989780,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts\/989703\/revisions\/989780"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/media\/989704"}],"wp:attachment":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/media?parent=989703"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/categories?post=989703"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/tags?post=989703"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}