{"id":989705,"date":"2020-06-25T22:46:04","date_gmt":"2020-06-25T22:46:04","guid":{"rendered":"https:\/\/www.ingener.com\/realizacion-de-obras-de-renovacion-y-ampliacion-en-12-estaciones-de-150-kv-de-la-red-de-trasmision-de-ute\/"},"modified":"2026-11-03T13:50:31","modified_gmt":"2026-11-03T12:50:31","slug":"ute-expansion-12-substations-150-kv","status":"publish","type":"post","link":"https:\/\/www.ingener.com\/en\/ute-expansion-12-substations-150-kv\/","title":{"rendered":"UTE &#8211; Expansion of 12 Substations (150 kV)"},"content":{"rendered":"<div class=\"vgblk-rw-wrapper limit-wrapper\">\n<div class=\"proyecto-detalles\" style=\"margin-bottom:25px;\">\n<p class=\"proyecto-lugar-periodo\" style=\"color:#1FA22E;font-size:1.4em;font-weight:700;text-transform:uppercase;letter-spacing:0.5px;margin:0 0 6px 0;\">Uruguay \u2014 2013\/2014<\/p>\n<p class=\"proyecto-cliente\" style=\"color:#777777;margin:0;\">Client: UTE Plan del Norte<\/p>\n<\/div>\n<p>Renovation and expansion works at 12 substations of UTE\u2019s 150 kV transmission network.<\/p>\n<p>&nbsp;<\/p>\n<p>In 2013, UTE awarded the tender to TEYMA. Ingener was subcontracted for the construction of the line switching sections, transformer switching sections, bus coupler switching sections and busbar voltage measurement sections.<\/p>\n<p>&nbsp;<\/p>\n<p>The scope also included infrastructure works (building extensions, roads, transformer pits and tracks, columns, trenches, ducts) and the installation of high-voltage equipment, as well as the detailed design of the following substations: Melo, Treinta y Tres, Valentines and Enrique Mart\u00ednez.<\/p>\n<div class=\"proyecto-galeria\">\n<figure><img decoding=\"async\" src=\"https:\/\/www.ingener.com\/wp-content\/uploads\/2020\/06\/08_AT_UTE-SE-AIS-1.jpg\" alt=\"UTE - Ampliaci\u00f3n 12 Estaciones de 150 kV\" loading=\"lazy\" \/><\/figure>\n<figure><img decoding=\"async\" src=\"https:\/\/www.ingener.com\/wp-content\/uploads\/2019\/03\/10_AT_UTE-SE-AIS.jpg\" alt=\"UTE - Ampliaci\u00f3n 12 Estaciones de 150 kV\" loading=\"lazy\" \/><\/figure>\n<figure><img decoding=\"async\" src=\"https:\/\/www.ingener.com\/wp-content\/uploads\/2018\/12\/09_Energi\u0301a_Valentines.jpg\" alt=\"UTE - Ampliaci\u00f3n 12 Estaciones de 150 kV\" loading=\"lazy\" \/><\/figure>\n<\/div>\n<\/div>\n<p><!-- .vgblk-rw-wrapper --><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Uruguay \u00b7 2013\/2014<\/p>\n","protected":false},"author":1,"featured_media":989706,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[102,100,93,92],"tags":[118],"class_list":["post-989705","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-electrical-infrastructure","category-high-and-extra-high-voltage","category-power","category-projects","tag-uruguay"],"_links":{"self":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts\/989705","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/comments?post=989705"}],"version-history":[{"count":1,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts\/989705\/revisions"}],"predecessor-version":[{"id":989801,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts\/989705\/revisions\/989801"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/media\/989706"}],"wp:attachment":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/media?parent=989705"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/categories?post=989705"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/tags?post=989705"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}