{"id":989707,"date":"2020-06-25T19:22:44","date_gmt":"2020-06-25T19:22:44","guid":{"rendered":"https:\/\/www.ingener.com\/central-termoelectrica-de-ciclo-combinado-punta-del-tigre-montaje-electromecanico-500kv-y-150-kv\/"},"modified":"2026-11-03T13:47:11","modified_gmt":"2026-11-03T12:47:11","slug":"500-132-kv-substation-punta-del-tigre","status":"publish","type":"post","link":"https:\/\/www.ingener.com\/en\/500-132-kv-substation-punta-del-tigre\/","title":{"rendered":"500\/132 kV Substation &#8211; Punta del Tigre"},"content":{"rendered":"<div class=\"vgblk-rw-wrapper limit-wrapper\">\n<div class=\"proyecto-detalles\" style=\"margin-bottom:25px;\">\n<p class=\"proyecto-lugar-periodo\" style=\"color:#1FA22E;font-size:1.4em;font-weight:700;text-transform:uppercase;letter-spacing:0.5px;margin:0 0 6px 0;\">San Jos\u00e9, Uruguay \u2014 2016\/2018<\/p>\n<p class=\"proyecto-cliente\" style=\"color:#777777;margin:0;\">Client: UTE. Subcontract for SIEMENS<\/p>\n<\/div>\n<p>The project involved the installation and erection of Uruguay\u2019s first 530 MW combined-cycle power plant.<\/p>\n<p>&nbsp;<\/p>\n<p>Under a turnkey contract with Siemens, Ingener was responsible for the electromechanical installation of the 31.5 kV, 150 kV and 500 kV connection works for the new plant.<\/p>\n<p>&nbsp;<\/p>\n<p>The works included:<\/p>\n<p>-Expansion of the 500 kV substation, where a new diameter with 3 circuit-breaker bays was installed and an existing diameter was equipped, also with three circuit-breaker bays.<\/p>\n<p>-Installation of two banks of 500\/150 kV, 300 MVA single-phase autotransformers, including oil treatment and filling.<\/p>\n<p>-Installation of gantries and equipment supports totaling more than 300 tonnes of steel structures.<\/p>\n<p>-Installation of busbars, switching equipment, panels, and power and control cabling, through to commissioning.<\/p>\n<p>-Electromechanical installation, cabling and termination of a new 14-bay 150 kV GIS substation, and the laying and termination of more than 6,000 m of 150 kV cable to connect the plant to the GIS and to the 500 kV substation.<\/p>\n<p>-Expansion of the existing plant\u2019s 150 kV substation with two new sections.<\/p>\n<div class=\"proyecto-galeria\">\n<figure><img decoding=\"async\" src=\"https:\/\/www.ingener.com\/wp-content\/uploads\/2020\/06\/05_AT_Pta-Tigre-500-kV-2.jpg\" alt=\"ET 500\/132 kV - Punta del Tigre\" loading=\"lazy\" \/><\/figure>\n<figure><img decoding=\"async\" src=\"https:\/\/www.ingener.com\/wp-content\/uploads\/2016\/09\/set.png\" alt=\"ET 500\/132 kV - Punta del Tigre\" loading=\"lazy\" \/><\/figure>\n<figure><img decoding=\"async\" src=\"https:\/\/www.ingener.com\/wp-content\/uploads\/2016\/11\/YT7dwlz_keZo3XS_qRkaFiXuSPfrYJNT4HuNmVD8qz1XEYGrk8y0uiAHuEIhTPo5vxwwO82wcB_z-9Qw1279-h693.jpg\" alt=\"ET 500\/132 kV - Punta del Tigre\" loading=\"lazy\" \/><\/figure>\n<figure><img decoding=\"async\" src=\"https:\/\/www.ingener.com\/wp-content\/uploads\/2018\/12\/imagen-2-1.jpg\" alt=\"ET 500\/132 kV - Punta del Tigre\" loading=\"lazy\" \/><\/figure>\n<figure><img decoding=\"async\" src=\"https:\/\/www.ingener.com\/wp-content\/uploads\/2018\/12\/imagen-1-2.jpg\" alt=\"ET 500\/132 kV - Punta del Tigre\" loading=\"lazy\" \/><\/figure>\n<\/div>\n<\/div>\n<p><!-- .vgblk-rw-wrapper --><\/p>\n","protected":false},"excerpt":{"rendered":"<p>San Jos\u00e9, Uruguay \u00b7 2016\/2018<\/p>\n","protected":false},"author":1,"featured_media":989708,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[102,100,93,92],"tags":[118],"class_list":["post-989707","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-electrical-infrastructure","category-high-and-extra-high-voltage","category-power","category-projects","tag-uruguay"],"_links":{"self":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts\/989707","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/comments?post=989707"}],"version-history":[{"count":1,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts\/989707\/revisions"}],"predecessor-version":[{"id":989774,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts\/989707\/revisions\/989774"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/media\/989708"}],"wp:attachment":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/media?parent=989707"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/categories?post=989707"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/tags?post=989707"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}