{"id":989713,"date":"2020-06-25T19:02:49","date_gmt":"2020-06-25T19:02:49","guid":{"rendered":"https:\/\/www.ingener.com\/statcom-50-mvar-subestacion-paraiso\/"},"modified":"2026-11-03T13:48:47","modified_gmt":"2026-11-03T12:48:47","slug":"paraiso-substation-new-50-mvar-statcom-system","status":"publish","type":"post","link":"https:\/\/www.ingener.com\/en\/paraiso-substation-new-50-mvar-statcom-system\/","title":{"rendered":"Para\u00edso Substation \u2013 New 50 MVAr STATCOM System"},"content":{"rendered":"<div class=\"vgblk-rw-wrapper limit-wrapper\">\n<div class=\"proyecto-detalles\" style=\"margin-bottom:25px;\">\n<p class=\"proyecto-lugar-periodo\" style=\"color:#1FA22E;font-size:1.4em;font-weight:700;text-transform:uppercase;letter-spacing:0.5px;margin:0 0 6px 0;\">Beni, Bolivia \u2014 2020\/2022<\/p>\n<p class=\"proyecto-cliente\" style=\"color:#777777;margin:0;\">Client: ENDE<\/p>\n<\/div>\n<p>Ingener, in a consortium with the multinational Siemens, was awarded by ENDE, Bolivia\u2019s state-owned power company, the engineering, supply, construction and commissioning of a new 50 MVAr STATCOM system to be installed at Para\u00edso substation, near the city of Trinidad, in Beni.<\/p>\n<p>&nbsp;<\/p>\n<p>It is a state-of-the-art static synchronous reactive power compensation system that improves the quality of power transmission.<\/p>\n<p>&nbsp;<\/p>\n<p>Ingener\u2019s works included:<\/p>\n<p>-Detailed civil engineering.<\/p>\n<p>-Civil works.<\/p>\n<p>-Electromechanical installation.<\/p>\n<p>-HVAC system.<\/p>\n<p>-Cooling system for the new reactive power compensation system.<\/p><\/div>\n<p><!-- .vgblk-rw-wrapper --><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Beni, Bolivia \u00b7 2020\/2022<\/p>\n","protected":false},"author":1,"featured_media":989714,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[102,100,93,92],"tags":[116],"class_list":["post-989713","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-electrical-infrastructure","category-high-and-extra-high-voltage","category-power","category-projects","tag-bolivia"],"_links":{"self":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts\/989713","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/comments?post=989713"}],"version-history":[{"count":1,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts\/989713\/revisions"}],"predecessor-version":[{"id":989788,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts\/989713\/revisions\/989788"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/media\/989714"}],"wp:attachment":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/media?parent=989713"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/categories?post=989713"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/tags?post=989713"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}