{"id":989725,"date":"2019-03-31T18:21:07","date_gmt":"2019-03-31T18:21:07","guid":{"rendered":"https:\/\/www.ingener.com\/subestaciones-montevideo-y-salto-grande-150kv-30kv\/"},"modified":"2026-11-03T13:49:35","modified_gmt":"2026-11-03T12:49:35","slug":"150-kv-substations-montevideo-m-sgu-expansion","status":"publish","type":"post","link":"https:\/\/www.ingener.com\/en\/150-kv-substations-montevideo-m-sgu-expansion\/","title":{"rendered":"150 kV Substations &#8211; Montevideo M and SGU Expansion"},"content":{"rendered":"<div class=\"vgblk-rw-wrapper limit-wrapper\">\n<div class=\"proyecto-detalles\" style=\"margin-bottom:25px;\">\n<p class=\"proyecto-lugar-periodo\" style=\"color:#1FA22E;font-size:1.4em;font-weight:700;text-transform:uppercase;letter-spacing:0.5px;margin:0 0 6px 0;\">Montevideo and Salto, Uruguay \u2014 2014\/2016<\/p>\n<p class=\"proyecto-cliente\" style=\"color:#777777;margin:0;\">Client: UTE. Subcontract for Teyma<\/p>\n<\/div>\n<p>We undertook the civil and electrical engineering design, electromechanical installation, supplies, spare parts and related services for the expansion of the Salto Grande Uruguay (SGU) Substation.<\/p>\n<p>&nbsp;<\/p>\n<p>Ingener\u2019s works included:<\/p>\n<p>-Expansion of the existing substation.<\/p>\n<p>-Expansion of the 150 kV main and auxiliary busbars.<\/p>\n<p>-Supply and installation of towers for the modification of 150 kV line entries.<\/p>\n<p>-Construction of the control building.<\/p>\n<p>-Installation of medium-voltage switchgear.<\/p>\n<p>-Construction of the new Montevideo M substation.<\/p>\n<p>-Design, installation and commissioning of the protection system for the lines to MVM at the Montevideo I and Montevideo A substations.<\/p>\n<p>&nbsp;<\/p><\/div>\n<p><!-- .vgblk-rw-wrapper --><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Montevideo and Salto, Uruguay \u00b7 2014\/2016<\/p>\n","protected":false},"author":1,"featured_media":989726,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[102,100,93,92],"tags":[118],"class_list":["post-989725","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-electrical-infrastructure","category-high-and-extra-high-voltage","category-power","category-projects","tag-uruguay"],"_links":{"self":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts\/989725","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/comments?post=989725"}],"version-history":[{"count":1,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts\/989725\/revisions"}],"predecessor-version":[{"id":989794,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts\/989725\/revisions\/989794"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/media\/989726"}],"wp:attachment":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/media?parent=989725"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/categories?post=989725"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/tags?post=989725"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}