{"id":989737,"date":"2018-12-28T18:39:41","date_gmt":"2018-12-28T18:39:41","guid":{"rendered":"https:\/\/www.ingener.com\/parque-eolico-arias-70-mw\/"},"modified":"2026-11-03T13:48:36","modified_gmt":"2026-11-03T12:48:36","slug":"colonia-arias-wind-farm-70-mw","status":"publish","type":"post","link":"https:\/\/www.ingener.com\/en\/colonia-arias-wind-farm-70-mw\/","title":{"rendered":"Colonia Arias Wind Farm &#8211; 70 MW"},"content":{"rendered":"<div class=\"vgblk-rw-wrapper limit-wrapper\">\n<div class=\"proyecto-detalles\" style=\"margin-bottom:25px;\">\n<p class=\"proyecto-lugar-periodo\" style=\"color:#1FA22E;font-size:1.4em;font-weight:700;text-transform:uppercase;letter-spacing:0.5px;margin:0 0 6px 0;\">Flores, Uruguay \u2014 2016\/2017<\/p>\n<p class=\"proyecto-cliente\" style=\"color:#777777;margin:0;\">Client: GAMESA<\/p>\n<\/div>\n<p>The wind farm, located in the department of Flores, comprises 35 wind turbines of 2 MW each, generating 300 GWh per year, with a capacity of 70 MW.<\/p>\n<p>&nbsp;<\/p>\n<p>As part of this project, Gamesa entrusted Ingener with:<\/p>\n<p>-Detailed engineering.<\/p>\n<p>-Complete installation of the MV collection network.<\/p>\n<p>-Installation and termination of the wind turbine switchgear.<\/p>\n<p>-EPC construction of the step-up substation, the connection and metering point (PCyM) and the connection to the 150 kV transmission grid.<\/p>\n<div class=\"proyecto-galeria\">\n<figure><img decoding=\"async\" src=\"https:\/\/www.ingener.com\/wp-content\/uploads\/2018\/12\/dsc3044-scaled.jpg\" alt=\"Parque E\u00f3lico Colonia Arias -  70MW\" loading=\"lazy\" \/><\/figure>\n<figure><img decoding=\"async\" src=\"https:\/\/www.ingener.com\/wp-content\/uploads\/2018\/12\/dsc8597-scaled.jpg\" alt=\"Parque E\u00f3lico Colonia Arias -  70MW\" loading=\"lazy\" \/><\/figure>\n<\/div>\n<\/div>\n<p><!-- .vgblk-rw-wrapper --><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Flores, Uruguay \u00b7 2016\/2017<\/p>\n","protected":false},"author":1,"featured_media":989738,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[92,94,105],"tags":[118],"class_list":["post-989737","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-projects","category-renewable-energy","category-wind-power","tag-uruguay"],"_links":{"self":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts\/989737","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/comments?post=989737"}],"version-history":[{"count":1,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts\/989737\/revisions"}],"predecessor-version":[{"id":989785,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts\/989737\/revisions\/989785"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/media\/989738"}],"wp:attachment":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/media?parent=989737"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/categories?post=989737"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/tags?post=989737"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}