{"id":989750,"date":"2018-12-21T20:28:56","date_gmt":"2018-12-21T20:28:56","guid":{"rendered":"https:\/\/www.ingener.com\/parque-eolico-la-banderita-396-mw\/"},"modified":"2026-11-03T13:47:03","modified_gmt":"2026-11-03T12:47:03","slug":"la-banderita-wind-farm-40-mw","status":"publish","type":"post","link":"https:\/\/www.ingener.com\/en\/la-banderita-wind-farm-40-mw\/","title":{"rendered":"La Banderita Wind Farm &#8211; 40 MW"},"content":{"rendered":"<div class=\"vgblk-rw-wrapper limit-wrapper\">\n<div class=\"proyecto-detalles\" style=\"margin-bottom:25px;\">\n<p class=\"proyecto-lugar-periodo\" style=\"color:#1FA22E;font-size:1.4em;font-weight:700;text-transform:uppercase;letter-spacing:0.5px;margin:0 0 6px 0;\">General Acha, La Pampa Province \u2014 2017\/2018<\/p>\n<p class=\"proyecto-cliente\" style=\"color:#777777;margin:0;\">Client: Parques E\u00f3licos Vientos del Sur S.A. (Grupo Frali)<\/p>\n<\/div>\n<p>La Banderita wind farm, located near General Acha, La Pampa, has 11 wind turbines of 3.6 MW each, for a total installed capacity of 40 MW.<\/p>\n<p>&nbsp;<\/p>\n<p>Ingener executed the BOP of the 40 MW La Banderita wind farm under an EPC contract.<\/p>\n<p>&nbsp;<\/p>\n<p>The works included:<\/p>\n<p>-Detailed engineering.<\/p>\n<p>-Complete civil works for the wind farm, including earthworks and wind turbine foundations, as well as access and internal roads.<\/p>\n<p>-Complete electrical works, including the 33 kV internal collection network and connection to the wind turbines.<\/p>\n<p>-EPC of the 33\/132 kV step-up substation, the 132 kV connection and metering point, and the connection to the transmission grid.<\/p>\n<div class=\"proyecto-galeria\">\n<figure><img decoding=\"async\" src=\"https:\/\/www.ingener.com\/wp-content\/uploads\/2018\/12\/01_Energi\u0301a_La-Banderita-2.jpg\" alt=\"Parque e\u00f3lico La Banderita - 40 MW\" loading=\"lazy\" \/><\/figure>\n<figure><img decoding=\"async\" src=\"https:\/\/www.ingener.com\/wp-content\/uploads\/2018\/12\/21-scaled.jpg\" alt=\"Parque e\u00f3lico La Banderita - 40 MW\" loading=\"lazy\" \/><\/figure>\n<figure><img decoding=\"async\" src=\"https:\/\/www.ingener.com\/wp-content\/uploads\/2019\/03\/10_AT_UTE-SE-AIS.jpg\" alt=\"Parque e\u00f3lico La Banderita - 40 MW\" loading=\"lazy\" \/><\/figure>\n<figure><img decoding=\"async\" src=\"https:\/\/www.ingener.com\/wp-content\/uploads\/2016\/10\/4.jpg\" alt=\"Parque e\u00f3lico La Banderita - 40 MW\" loading=\"lazy\" \/><\/figure>\n<\/div>\n<\/div>\n<p><!-- .vgblk-rw-wrapper --><\/p>\n","protected":false},"excerpt":{"rendered":"<p>General Acha, La Pampa Province \u00b7 2017\/2018<\/p>\n","protected":false},"author":1,"featured_media":989751,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[92,94,105],"tags":[115],"class_list":["post-989750","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-projects","category-renewable-energy","category-wind-power","tag-argentina"],"_links":{"self":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts\/989750","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/comments?post=989750"}],"version-history":[{"count":1,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts\/989750\/revisions"}],"predecessor-version":[{"id":989772,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts\/989750\/revisions\/989772"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/media\/989751"}],"wp:attachment":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/media?parent=989750"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/categories?post=989750"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/tags?post=989750"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}