{"id":989753,"date":"2018-12-21T20:06:10","date_gmt":"2018-12-21T20:06:10","guid":{"rendered":"https:\/\/www.ingener.com\/parques-eolicos-la-genoveva\/"},"modified":"2026-11-03T13:48:24","modified_gmt":"2026-11-03T12:48:24","slug":"la-genoveva-i-ii-wind-farm-140-mw","status":"publish","type":"post","link":"https:\/\/www.ingener.com\/en\/la-genoveva-i-ii-wind-farm-140-mw\/","title":{"rendered":"La Genoveva I and II Wind Farm &#8211; 140 MW"},"content":{"rendered":"<div class=\"vgblk-rw-wrapper limit-wrapper\">\n<div class=\"proyecto-detalles\" style=\"margin-bottom:25px;\">\n<p class=\"proyecto-lugar-periodo\" style=\"color:#1FA22E;font-size:1.4em;font-weight:700;text-transform:uppercase;letter-spacing:0.5px;margin:0 0 6px 0;\">Bah\u00eda Blanca, Buenos Aires \u2014 2018\/2019<\/p>\n<p class=\"proyecto-cliente\" style=\"color:#777777;margin:0;\">Client: Vientos La Genoveva S.A.U (Central Puerto)<\/p>\n<\/div>\n<p>Turnkey construction of the 33\/132 kV, 60 MW substation for the 140 MW La Genoveva I and II wind farm, located 40 km from the city of Bah\u00eda Blanca, Buenos Aires Province, and 10 km from the town of Cabildo.<\/p>\n<p>&nbsp;<\/p>\n<p>The works included:<\/p>\n<p>-Detailed engineering.<\/p>\n<p>-Civil works for the substation.<\/p>\n<p>-Electromechanical installation.<\/p>\n<p>-Connection to the 132 kV transmission grid, including line loop-in and commissioning.<\/p>\n<div class=\"proyecto-galeria\">\n<figure><img decoding=\"async\" src=\"https:\/\/www.ingener.com\/wp-content\/uploads\/2018\/12\/dsc5896.jpg\" alt=\"Parque E\u00f3lico La Genoveva I y II - 140 MW\" loading=\"lazy\" \/><\/figure>\n<figure><img decoding=\"async\" src=\"https:\/\/www.ingener.com\/wp-content\/uploads\/2018\/12\/dsc5878.jpg\" alt=\"Parque E\u00f3lico La Genoveva I y II - 140 MW\" loading=\"lazy\" \/><\/figure>\n<\/div>\n<\/div>\n<p><!-- .vgblk-rw-wrapper --><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Bah\u00eda Blanca, Buenos Aires \u00b7 2018\/2019<\/p>\n","protected":false},"author":1,"featured_media":989754,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[92,94,105],"tags":[115],"class_list":["post-989753","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-projects","category-renewable-energy","category-wind-power","tag-argentina"],"_links":{"self":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts\/989753","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/comments?post=989753"}],"version-history":[{"count":1,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts\/989753\/revisions"}],"predecessor-version":[{"id":989782,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts\/989753\/revisions\/989782"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/media\/989754"}],"wp:attachment":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/media?parent=989753"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/categories?post=989753"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/tags?post=989753"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}