{"id":989758,"date":"2017-08-11T20:02:10","date_gmt":"2017-08-11T20:02:10","guid":{"rendered":"https:\/\/www.ingener.com\/el-naranjal\/"},"modified":"2026-11-03T13:46:59","modified_gmt":"2026-11-03T12:46:59","slug":"el-naranjal-solar-pv-park-54-mwp","status":"publish","type":"post","link":"https:\/\/www.ingener.com\/en\/el-naranjal-solar-pv-park-54-mwp\/","title":{"rendered":"El Naranjal Solar PV Park &#8211; 54 MWp"},"content":{"rendered":"<div class=\"vgblk-rw-wrapper limit-wrapper\">\n<div class=\"proyecto-detalles\" style=\"margin-bottom:25px;\">\n<p class=\"proyecto-lugar-periodo\" style=\"color:#1FA22E;font-size:1.4em;font-weight:700;text-transform:uppercase;letter-spacing:0.5px;margin:0 0 6px 0;\">Salto, Uruguay \u2014 2015\/2017<\/p>\n<p class=\"proyecto-cliente\" style=\"color:#777777;margin:0;\">Client: Atlas Renewable Energy<\/p>\n<\/div>\n<p>In 2015, Ingener was awarded the complete construction of the El Naranjal solar PV park, with 54 MWp of installed capacity, located near the city of Salto, Uruguay. This state-of-the-art park included a solar tracking system to maximize electricity generation throughout the day and across the seasons.<\/p>\n<p>&nbsp;<\/p>\n<p>The works carried out by Ingener included:<\/p>\n<p>-Detailed engineering.<\/p>\n<p>-Earthworks.<\/p>\n<p>-Civil works.<\/p>\n<p>-Installation of approximately 3,000 tonnes of tracker support structures.<\/p>\n<p>-Installation of nearly 200,000 PV panels.<\/p>\n<p>-Complete installation of the low- and medium-voltage collection network.<\/p>\n<p>-Engineering and works required to interconnect the park to the national 150 kV transmission grid, including the construction of substations and a 150 kV overhead line with steel lattice towers.<\/p>\n<p>&nbsp;<\/p>\n<p>Following the construction and commissioning of the solar park, Ingener took over its full Operation and Maintenance for a 10-year term, guaranteeing the park\u2019s performance ratio (PR) under its O&amp;M contract.<\/p>\n<figure class=\"proyecto-video\"><iframe width=\"100%\" height=\"480\" src=\"https:\/\/www.youtube.com\/embed\/O35XOps_Utc\" title=\"Parque Fotovoltaico El Naranjal - 54 MWp\" frameborder=\"0\" allowfullscreen><\/iframe><\/figure>\n<div class=\"proyecto-galeria\">\n<figure><img decoding=\"async\" src=\"https:\/\/www.ingener.com\/wp-content\/uploads\/2017\/08\/Foto-N\u00b01-Renovables-scaled.jpg\" alt=\"Parque Fotovoltaico El Naranjal - 54 MWp\" loading=\"lazy\" \/><\/figure>\n<figure><img decoding=\"async\" src=\"https:\/\/www.ingener.com\/wp-content\/uploads\/2019\/01\/b.jpg\" alt=\"Parque Fotovoltaico El Naranjal - 54 MWp\" loading=\"lazy\" \/><\/figure>\n<figure><img decoding=\"async\" src=\"https:\/\/www.ingener.com\/wp-content\/uploads\/2017\/08\/dsc4714-scaled.jpg\" alt=\"Parque Fotovoltaico El Naranjal - 54 MWp\" loading=\"lazy\" \/><\/figure>\n<figure><img decoding=\"async\" src=\"https:\/\/www.ingener.com\/wp-content\/uploads\/2017\/08\/05.jpg\" alt=\"Parque Fotovoltaico El Naranjal - 54 MWp\" loading=\"lazy\" \/><\/figure>\n<figure><img decoding=\"async\" src=\"https:\/\/www.ingener.com\/wp-content\/uploads\/2017\/08\/08.jpg\" alt=\"Parque Fotovoltaico El Naranjal - 54 MWp\" loading=\"lazy\" \/><\/figure>\n<figure><img decoding=\"async\" src=\"https:\/\/www.ingener.com\/wp-content\/uploads\/2017\/08\/05_Energi\u0301a_El-Litoral.jpg\" alt=\"Parque Fotovoltaico El Naranjal - 54 MWp\" loading=\"lazy\" \/><\/figure>\n<\/div>\n<\/div>\n<p><!-- .vgblk-rw-wrapper --><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Salto, Uruguay \u00b7 2015\/2017<\/p>\n","protected":false},"author":1,"featured_media":989759,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[92,94,106],"tags":[118],"class_list":["post-989758","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-projects","category-renewable-energy","category-solar-pv","tag-uruguay"],"_links":{"self":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts\/989758","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/comments?post=989758"}],"version-history":[{"count":1,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts\/989758\/revisions"}],"predecessor-version":[{"id":989771,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/posts\/989758\/revisions\/989771"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/media\/989759"}],"wp:attachment":[{"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/media?parent=989758"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/categories?post=989758"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ingener.com\/en\/wp-json\/wp\/v2\/tags?post=989758"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}