This project involves the installation of two new sets of 150-kV underground cables to interconnect the Montevideo A (MVA), Montevideo Norte (NOR), and Montevideo P (MVP) substations. This project will strengthen the electrical transmission infrastructure in Montevideo, increasing the system’s reliability and operational flexibility.