
In 2015, Ingener was awarded the complete construction of El Naranjal photovoltaic power plant, with an installed power capacity of…
Engineering the energy transformation of the future
In 2021, we signed the contract to build the most important substation in the country.
VIEW PROJECTS
In 2015, Ingener was awarded the complete construction of El Naranjal photovoltaic power plant, with an installed power capacity of…
UTE awarded APR, a global company specializing in renting temporary solutions for power generation, a 200 MW upgrade of the…
La Banderita wind farm, located near Gral Acha, province of La Pampa, Argentina, has eleven 3.6 MW wind turbines, totaling…
Download more information about us
VIEW BROCHURE