Having worked more than two years for SACEEM company under a direct contract, in 2011, under ANCAP desulfurization diesel and gas plant project —a plant for the production of high-quality, low-sulfur fuels—, Ingener signed a contract with AESA for performing the medium and low voltage assembly and control wiring of the plants.
The electrical work involved the construction of over 10 km of electrical conduits, the stringing of more than 100 km of medium and low voltage cables, the installation of over 120 km of the control cable and the execution of more than 600 instrumentation hook-ups, with explosion-proof installations in classified areas.
ANCAP – DESULFURIZATION PLANT
                            Uruguay, 2009/2012                        
                        
                                                    Areas of expertise:
                        
                           industriesManufacturing Industry                        
                    ANCAP - desulfurization plant
 
        	    	

