150 KV GIS – JOSE IGNACIO

Ingener, in consortium with Teyma, was awarded with an EPC contract for the construction of a 150/31.5 kV SF6 GIS that would be located near Jose Ignacio, department of Maldonado, Uruguay.
The work that Ingener will perform includes the detailed engineering, selection and supply of the GIS and of the remaining electro-mechanical equipment, full electro-mechanical assembly and the substation commissioning.