EMERGENCY THERMAL POWER GENERATION – 200MW

Contract amount: USD 6.000.000
Punta del Tigre, Uruguay, 2013
Areas of expertise: EnergyShow in homeThermal

UTE. Subcontract from APR

EMERGENCY THERMAL POWER GENERATION – 200MW

UTE awarded APR, a global company specializing in renting temporary solutions for power generation, a 200 MW upgrade of the temporary generation service. For this service, 100MW were installed at UTE Punta del Tigre plant and other 100MW at UTE La Tablada plant.
Once again, APR entrusted Ingener with the local works for the installation of the equipment in both locations. On this occasion, in particular, in addition to the electrical work —MV and HV construction for connecting the units to the national 150kV network and installation of LV auxiliary services— and the mechanical work —piping for fuel supply, as well as auxiliary water and effluent services— Ingener carried out the civil works for the construction of two generation units bases.
These civil works posed a real challenge, due to its tight schedule to develop the engineering and complete the work, which required a high level of precision for the equipment anchoring. It is worth noticing that 15 tons of carbon steel pipes were used between both La Tablada and La Teja projects.