					Nota publicada en El Observador sobre la participación de Ingener en la parada de planta en
Press releases, media and image archives
 
					Nota publicada en El Observador sobre la participación de Ingener en la parada de planta en
 
					Entrevista a Santiago Tosar, gerente Comercial de Ingener, en Semanario Crónicas Económicas. Ingener, una compañía
 
					Entrevista a Daniel Vázquez, presidente y director ejecutivo de Ingener, en El Cronista. Daniel Vázquez es
 
					Entrevista a Santiago Tosar, gerente Comercial de Ingener, en suplemento especial del diario El Observador, por
 
					Entrevista a Daniel Vázquez en Suplemento Especial de El Observador por el 110° aniversario de UTE.
 
					In Ingener we took on a great challenge in the megaproject of UPM Paso de los
 
					Article in the U.S. magazine NewsWeek Established nearly 25 years ago, dynamic maintenance services provider Ingener
 
					We share the Latin American media report on the awarding of works in Paraguay. CLICK HERE
 
					Our company arrives in Paraguay, in partnership with the companies SACEEM and CONCRET MIX, to build
 
					The inauguration of the interconnection works of the new UPM plant with the Uruguayan power grid,
 
					We share the Latin American media report on the awarding of works in Bolivia’s interconnected system.
 
					Ingener is promoting the use of electric vehicles in Uruguay.
 
					Interview by journalist Nanda Singh to Ingener’s Business Development Manager in Argentina, Alejandro Hunko. Ingener, a
 
					We support our clients’ business by understanding their needs and expectations. Established in 1998 as a
 
					Below you will find media publications related to “Los Meandros” Wind farm. INGENER’S report on Los
 
					Alejandro Hunko, Ingener’s Business Development Manager, took part in the “Protagonistas” interview program, conducted by Energía
 
					The Uruguayan company INGENER strengthened its position in Argentina’s renewable energy area by signing a turnkey
 
					Following you will find some press releases on Ingener’ s attendance at AIREC 2018. Energía Estratégica:
 
					Below you will find media publications related to “La Genoveva” wind farm El país: Plant sets
 
					Below you will find media publications related to “La Banderita” wind farm: El Cronitas: Wind farm
 
					INGENER, the leading engineering and construction company in Uruguay dedicated to conducting power generation and transmission
 
					INGENER was one of the sponsors and exhibitors of 2018 AIREC. Throughout four days and from
 
					After completing the concrete works of the first wind turbine base, INGENER fulfills an important milestone
 
					This is INGENER, the firm that will build the infrastructure of the 39.6 MW “La Banderita”
 
					The Uruguayan company INGENER will build the infrastructure of the 39.6 MW “La Banderita” wind farm
 
					In addition to those already obtained in Quality and SYSO. The company INGENER S.A. has
 
					Ingener is working with turnkey civil works and electric infrastructure contracts amounting to 100 MW. Ingener
 
					From October 9th to 13th, URUMAN [Uruguayan maintenance, asset management and reliability society] held the 13th
 
					For the second consecutive year Ingener was a sponsor of AIREC, Argentina’s International Renewable Energy Congress,
 
					On March 9th and 10th, the Energyear Conosur congress was held at the Madero Hotel in
 
					PROJECT: DURO FELGUERA ARGENTINA S.A. – FAINSER S.A. – UTE – Electrical assembly. Vuelta de Obligado
 
					PROJECT: ANCAP – Assembly works for increasing the topping and vacuum unit capacity in La Teja
 
					By Diego Invernizzi, Ingener’s Commercial Manager. In the last few years, Ingener has had a
 
					The Uruguayan engineering and construction company wants to replicate in Argentina the experience that it managed
Interview with Diego Invernizzi, Ingener’s Commercial Manager, at AIREC 2016.
 
					On September 21st, 22nd and 23rd, the Argentina International Renewable Energy Congress, AIREC 2016, was held
 
					Client: APR Energy Argentina – End Client: Compañía Administradora del Mercado Mayorista Eléctrico S.A. (Argentina).
 
					Client: ANCAP. Project: Public Tender N°1600155300, Remodeling of the fire prevention system (SPCI) of ANCAP
 
					Project: With an investment of over US$500 million, the project involves the installation and erection of
 
					BOLIVIA – ENDE, SAN JOSÉ HYDROELECTRIC POWER PLANT. Turnkey project for two 124 MW – 230
 
					“At Ingener we create relationships based on trust, we work on a team system and from
 
					SunEdison: 50 MW El Naranjal photovoltaic power station and 16 MW Del Litoral photovoltaic power station
 
					PLASTIPAK: industrial plant. PLASTIPAK, a leading packaging company, entrusted Ingener with the refurbishment, pathways and industrial
 
					UTE: 150 kV transmission network –M substation in Montevideo and SGU substation in Salto Grande
 
					Operation and maintenance services at ANCAP plants: ANCAP called for bids and awarded Ingener the industrial