The inauguration of the interconnection works of the new UPM plant with the Uruguayan power grid, for which Ingener designed and built the high voltage substations (PTO and BO-B), took place on June 18. The event was attended by the Minister of Industry, Omar Paganini; the President of UTE, Silvia Emaldi; authorities of UPM and UTE, and the contractors of the works.