Uruguay — 2008/2010
Client: Administración Nacional de Puertos (ANP)
Between 2008 and 2010, Ingener carried out for the National Ports Administration (ANP) all the works related to the expansion and refurbishment of the buildings and the electromechanical works at existing electrical transformation and distribution substations No. 1 and No. 2.
The contract comprised:
-Design, supply, civil works and electromechanical installation of new 31.5 kV and 6.3 kV equipment.
-Installation of the new 31.5 kV switchgear assembly at substation No. 2.
-Relocation of the existing 31.5 kV switchgear assembly at both substations.
-Addition of new switchgear cubicles.
-Power and control interconnections.
-Commissioning of all equipment.