Uruguay — 2014/2015
Client: Costa Oriental S.A
Detailed engineering, supply, installation, commissioning, adjustment and warranty service for the fire suppression systems in the Costa Park I, II, III and IV buildings at Zonamerica, covering a total area of more than 40,000 m2.
The works carried out by Ingener included:
-Supply and laying of 400 mm HDPE piping for the feed to the sprinkler network of each warehouse.
-Installation of more than 75 tonnes of 1-1/2” to 12” steel piping.
-Installation of more than 4,000 automatic sprinklers.