Uruguay — 2009/2012
Client: ANCAP – Desulfurization Plant
As part of ANCAP’s Low-Sulfur Diesel and Gasoline project, which enables the production of high-quality, low-sulfur fuels, Ingener, after working for more than two years for Saceem under a direct contract, signed an agreement with AESA in 2011 to carry out the low- and medium-voltage electrical installation and control cabling for the plants.
The electrical works included:
-Installation of more than 10 km of electrical raceways.
-More than 100 km of medium- and low-voltage cable runs.
-More than 120 km of control cable runs and more than 600 instrumentation hook-ups.
-Explosion-proof installations in classified areas.