Punta del Tigre, Uruguay — 2013
Client: UTE. Subcontract for APR
UTE awarded APR, a global provider of rental power generation equipment for emergency situations, a 200 MW expansion of its temporary generation service. The service was implemented by installing 100 MW at UTE’s Punta del Tigre Power Plant and 100 MW at UTE’s La Tablada Power Plant.
Once again, APR entrusted Ingener with the local works for the installation of the equipment at both sites.
The works included:
-Medium- and high-voltage installations to connect the units to the national 150 kV transmission grid, and low-voltage auxiliary services.
-Piping installations for fuel supply and auxiliary water and effluent services.
-Civil works for the foundations of two of the generating units.