Treinta y Tres, Uruguay — 2015/2016
Client: GAMESA
Gamesa, the Spanish wind turbine manufacturer, awarded Ingener the Electrical Balance of Plant (BOP) works for a new 70 MW wind farm owned by UTE in Valentines.
Our scope of work included:
-Installation of the medium-voltage collection network.
-Construction of the wind farm’s collector and step-up substation.
-Expansion of UTE’s transmission substation in Valentines to interconnect the wind farm to the national power grid.

