General Acha, La Pampa Province — 2017/2018
Client: Parques Eólicos Vientos del Sur S.A. (Grupo Frali)
La Banderita wind farm, located near General Acha, La Pampa, has 11 wind turbines of 3.6 MW each, for a total installed capacity of 40 MW.
Ingener executed the BOP of the 40 MW La Banderita wind farm under an EPC contract.
The works included:
-Detailed engineering.
-Complete civil works for the wind farm, including earthworks and wind turbine foundations, as well as access and internal roads.
-Complete electrical works, including the 33 kV internal collection network and connection to the wind turbines.
-EPC of the 33/132 kV step-up substation, the 132 kV connection and metering point, and the connection to the transmission grid.