La Genoveva I and II Wind Farm – 140 MW

Bahía Blanca, Buenos Aires · 2018/2019

Bahía Blanca, Buenos Aires — 2018/2019

Client: Vientos La Genoveva S.A.U (Central Puerto)

Turnkey construction of the 33/132 kV, 60 MW substation for the 140 MW La Genoveva I and II wind farm, located 40 km from the city of Bahía Blanca, Buenos Aires Province, and 10 km from the town of Cabildo.

 

The works included:

-Detailed engineering.

-Civil works for the substation.

-Electromechanical installation.

-Connection to the 132 kV transmission grid, including line loop-in and commissioning.

Parque Eólico La Genoveva I y II - 140 MW
Parque Eólico La Genoveva I y II - 140 MW