Salto, Uruguay — 2015/2017
Client: Atlas Renewable Energy
In 2015, Ingener was awarded the complete construction of the El Naranjal solar PV park, with 54 MWp of installed capacity, located near the city of Salto, Uruguay. This state-of-the-art park included a solar tracking system to maximize electricity generation throughout the day and across the seasons.
The works carried out by Ingener included:
-Detailed engineering.
-Earthworks.
-Civil works.
-Installation of approximately 3,000 tonnes of tracker support structures.
-Installation of nearly 200,000 PV panels.
-Complete installation of the low- and medium-voltage collection network.
-Engineering and works required to interconnect the park to the national 150 kV transmission grid, including the construction of substations and a 150 kV overhead line with steel lattice towers.
Following the construction and commissioning of the solar park, Ingener took over its full Operation and Maintenance for a 10-year term, guaranteeing the park’s performance ratio (PR) under its O&M contract.