Central Batlle Engine Plant – 80 MW

2009/2010

2009/2010

Client: UTE. Subcontract for the Teyma – Saceem Consortium

As a subcontractor to the Teyma-Saceem consortium, Ingener took part in the turnkey supply of a power generation plant for UTE, located at the José Batlle y Ordóñez Thermal Power Plant. The plant has a total installed capacity of 80 MW, using eight reciprocating internal combustion engines of 10 MW each.

 

At Ingener, we were responsible for building the substation connecting the plant to the high-voltage network of the national transmission system.

 

The works included:

-Medium- and low-voltage electrical installation for the generators and all support services.

-Integration of the plant’s SCADA with the SCADA of UTE’s national load dispatch center.