Montevideo, Uruguay — 2013/2014
Client: Katoen Natie – TCP
As the main electromechanical contractor for Terminal Cuenca del Plata (TCP), we developed the design, supply and installation of a firefighting system at its facilities in the port of Montevideo.
UL Listed and FM Approved equipment and materials were used, in compliance with NFPA 13, NFPA 14 and NFPA 20. The work focused on TCP’s Logistics 1 and Logistics 2 buildings.
Ingener’s works included:
-Supply and installation of more than 1,000 automatic sprinklers.
-Installation of a new fire pump room.