Montevideo, Uruguay — 2010/2011
Client: World Trade Center Tower IV
Electrical installation in Tower IV of the World Trade Center (WTC) Montevideo, one of the most important multi-tenant office complexes in Uruguay, standing 130 meters tall with a total of 46 levels.
Ingener’s work consisted of:
-Turnkey electrical installation.
-Laying of medium- and low-voltage lines.
-Installation of cable trays and electrical raceways.
-Installation of the grounding grid.
-Installation of two MV/LV substations.
-Fabrication and installation of panels.

